Useful information includes peak customer numbers, current queue locations, customer and vehicle routes, collection procedures, delivery times, available footprint, operating hours and the period for which the structure may be required. Having that operational picture makes it easier to determine whether physical temporary infrastructure is appropriate and where it could provide the greatest practical benefit.